BARTLETT ROADS AND STREETS DEPARTMENT |
2007 ROAD AGENT REPORT
This past summer we had a change in
personnel on the Highway Department.
Gerald James, who worked for the town for 4 years part time and then 9
years full time, retired in August.
We hired Earl Hill to take his
place and he was the perfect choice for the job as he has plowed the Village
for the
town for the past few years when he worked
for Hanson Excavating. Earl is
very knowledgeable in his trade and in running equipment. He joins the other
very capable members of the crew,
Earle Fernald and Don Miller.
This past year the Highway Department was
able to complete the installation of several hundred feet of culverts, the
placement of cold mix
on
Dundee Road, Chandler Mountain Road, Little Ledge Road, Iron Ledge Road, and
at the Summit of Linderhof. We also did hot top on
East Branch Road,
Jericho
Road, and in the Ellis Ridge Road area. We sanded and
sealed
Town Hall Road,
Forest Ledge Road, and
Rolling Ridge Road.
All
of this road work was completed along with our regular road maintenance of
grading, ditching, and cold patching.
In 2008, we have several roads that we will
be working on. We want to thank the townspeople for their support and
patience while we do our jobs and also want to thank the Board of Selectmen,
the “girls” in the office, Fire Department and Police Department for their
support and assistance.
Respectfully submitted,
TRAVIS CHICK
Road Agent
__________________________________________
BARTLETT ROADS DEPARTMENT
2006 ROAD AGENT REPORT
In 2006 the
Highway Department was able to add a much needed piece of equipment to
its fleet and that is a backhoe. This was all possible because of all
the residents that came to Town Meeting and supported it. I am very
thankful for that as I am for all the support we get from the
townspeople.
The Highway Crew changed several hundred feet of
culverts this year. In Linderhof, we reconstructed a little over 400 ft.
of Ludwig Strasse and most of the turn around in Schwabing Place. A
section of Washington Ave. was redone because of a joint water line
project by North Conway Water Precinct and Lower Bartlett Water
Precinct. In 2006, the Highway Department was hit with a challenge and
that was the installation of 200 plus street signs and posts for the new
E911 system that was enacted. The posts were the hardest part because
there was no good way to put a 12 ft. post into the ground 4 ft. in the
“Granite State”. Looking at all options available to us, the way we did
it was the fastest way and that was two highway workers using a slide
hammer device and taking turns. But the good part is they were all put
up before the ground froze and we have had compliments from the
townspeople, the Fire Chief, and Police Chief.
I have to thank
the people of Bartlett for their patience when the roads are closed
because of downed trees or wires, while we work on replacing culverts or
reconstructing a road, or if you get stuck driving behind the plow
trucks. We can’t go very fast but during winter storms keeping a safe
distance behind us is the best place to be for all. I also want to thank
Fire Chief Pat Roberts and the Fire Dept. members and Police Chief
Connifey and his officers for all their support, and the Board of
Selectmen and wonderful staff at the Town Office for their help and
support.
Respectfully submitted,
TRAVIS CHICK
Road Agent